What to Watch When Specifying a Double Drum Mooring Winch (and Why LBS-Grooved Drums Are Quietly Winning)
If you’re weighing up a double drum mooring winch for a refit or a newbuild, here’s the short version: the drum surface engineering matters as much as the motor on the nameplate. In fact, many customers say grooved sleeves are where rope life is won or lost. That’s been my experience on quay visits, too—fewer hockles, fewer rewinds, calmer crews.

Trend check
Electrification (VFDs), condition monitoring, and OCIMF MEG4-aligned brake settings are now normal. The quieter revolution is LBS/Lebus-style groove sleeves. They’re retrofit-friendly and, surprisingly, they bridge the gap between steel wire and HMPE lines. On a double drum mooring winch, that translates into predictable spooling, fewer crushed wraps, steadier line tension.

Typical specification snapshot (with LBS-grooved sleeves)
| Parameter | Value (≈ real-world use may vary) |
|---|---|
| Rated pull | 100–300 kN @ 1st layer |
| Brake holding load | ≈1.25–1.5× rated (class-dependent; MEG4-aligned rendering) |
| Rope capacity | 600–1200 m (Ø44–56 mm wire or HMPE) |
| Drum style | Split double drum mooring winch, LBS helical-parallel groove sleeve |
| Drive | Electric VFD or hydraulic HPU |
| Speed | 0–15 m/min (25 m/min optional) |
| Materials | Q345B/S355 shell; 42CrMo sleeve; C5-M coating |
| Protection | IP56–IP66; ATEX/IECEx for tankers (optional) |
| Certifications | ABS/DNV/BV compliant; EN 10204 3.1 materials |

How the LBS sleeve is made (short version)
- Materials: Q345B/S355 base drum, 42CrMo forged sleeve ring, hardness ≈ HB 230–260.
- Methods: CNC turning, multi-start helical-parallel LBS groove machining, stress relief, shot blasting Sa 2.5.
- Testing: UT/MT on welds; groove gauge check ±0.2 mm; spooling test with wire Ø verification; brake static test at ≈1.25× rated; noise ≤85 dB(A).
- Standards referenced: ASME B30.7 (winches), OCIMF MEG4 (mooring), ABS/DNV rules, EN 10204 3.1 certs.
- Service life: 10–15 years design with periodic recoating; rope life uplift many operators report ≈25–40%.

Applications and real-world notes
Bulkers, tankers, Ro-Ro ramps, offshore supply vessels—anywhere a double drum mooring winch handles mixed rope inventories. I’ve seen sleeves retrofitted pier-side in a day, which keeps superintendents happy and stevedores friendlier than usual.
Vendor landscape (quick, practical view)
| Vendor | Core strength | Groove solution | Lead time (≈) | Notes |
|---|---|---|---|---|
| LBS (Shijiazhuang, China) | Customized drum sleeves, retrofits | LBS/Lebus-style precision grooves | 4–8 weeks | Cost-effective; address: NO.688 Zhongshan Road, Qiaoxi district, Hebei |
| MacGregor | Turnkey mooring systems | Multiple options | 16–32 weeks | Premium integration |
| Kongsberg Maritime | High-spec electric winches | Grooved drum, split-drum | 20–30 weeks | Offshore-ready |
| DMT Marine Equipment | Value-focused portfolio | Lebus-type optional | 12–20 weeks | Flexible specs |

Case file: Bulk carrier mooring refit
An operator swapped plain drums for LBS sleeves on a forward double drum mooring winch. After six months: rope life up ≈35%, reported mooring time down ≈12%, and zero slippage incidents in squalls. To be honest, the bosun just liked that the line “stayed where it should.”
Customization and procurement notes
- Groove pitch matched to rope Ø and construction (EN 12385 wire or ISO 10325/10425 offshore). HMPE-friendly radii available.
- CT (constant tension) and auto rendering set to MEG4 line design parameters.
- Docs: EN 10204 3.1, NDT reports, coating TDS, FAT protocol. Pricing can start low per sleeve and scale with size—ranges widely, honestly.
- Supply capacity quoted ≈10,000 pcs/month for sleeves—handy for fleet rollouts.

Testing highlights (FAT)
Functional run at 1.1× rated pull; brake static test at ≈1.25× rated; spooling test with full drum; gearbox oil temp monitoring; noise survey. Results are logged to class witness where required.
References
- OCIMF, Mooring Equipment Guidelines (MEG4), 2018.
- ASME B30.7, Winches, latest edition.
- ABS, Guide for Towing and Mooring, latest revision.
- DNV, Offshore Standard DNV-OS-E301 Position Mooring (now DNV-ST series), latest.
- EN 10204:2004, Metallic products — Types of inspection documents.
Shijiazhuang Junzhong Machinery Manufactruing Co., Ltd Our company was established in 200, it is an scientific and technological enterprises wich has been engaged in cable retracting system.Electric Winch it has gather a wealth of experience in multi-layer wincding of wire rope.Hydraulic Winch In the process of production and operation, we adhering to the “pursuit of excellence, excellence” concept and deep cooperation with domestic and foreign universities, research institutes, formed a “production, use, collaborative innovation” model of development, rigorous scientific method and the specialization of production, the combination of constantly absorbing new technology improved product of research and development, producing a batch of and a batch of high quality products suitable for the market,Also for customers to solve one after another technical problems.Winch Drum At the same time, the company has always followed the service attitude of “keep promise, treat each other honestly”, looking forward to sincere cooperation with customers at home and abroad!super blog